Arquitectura
Economía
Ciencias y humanidades
Ingenierías

Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/20.500.11839/9506
Título: Diseño del completamiento para un pozo inyector de CO2 alternado con agua ubicado en la Cuenca de los Llanos Orientales de Colombia
Otros títulos: Well completion design for alternate water and CO2 injection located in Llanos Basin of Colombia
Autor(es): Restrepo Rodríguez, Lady Sthephanie
Molano Puerto, David Mauricio
Docente Investigador: Jiménez Bracho, Edison Enrique
Tipo de licencia: Atribución|
Palabras clave: Análisis nodal;Completamiento de pozo;Inyección de agua;Nodal analysis;Well completion;Water injection;Tesis y disertaciones académicas
Fecha de publicación: 13-feb-2024
Editorial: Fundación Universidad de América
Resumen: El presente trabajo de grado se desarrolla en un campo ubicado en la cuenca de los Llanos Orientales de Colombia, en la cual, la producción de agua de sus pozos (BSW) alcanza hasta 95%; esto representa la causa principal del alto costo de las operaciones productivas de crudo, ya que involucran procesos de tratamientos que están enfocados en la inyección de agua en pozos de disposición, vertederos, etc. El campo en estudio es productor de crudo pesado (API de 8° en Formación 1 y 20° en Formación 2 (paquetes de arena A y B), presenta alto corte de agua, alta viscosidad y posee una alta cantidad de petróleo remanente que queda en el yacimiento sin drenar a pesar del uso de los sistemas de levantamiento artificial en los pozos productores, siendo el factor de recobro (FR) uno de los aspectos más críticos al ser apenas del 8% en la Formación 1 y 16% en la Formación 2; por estas razones, se considera que los procesos de recobro mejorado (EOR) pudieran ser no solo una solución para aumentar el factor de recobro del campo, sino también transformarlos en procesos cada vez más amigables con el medio ambiente, el cual es uno de los objetivos y/o compromisos para el año 2030-2050 de la compañía operadora.
Abstract: This degree work is developed in a field located in the Eastern Llanos basin of Colombia, in which the water production of its wells (BSW) reaches up to 95%; This represents the main cause of the high cost of crude oil production operations, since they involve treatment processes that are focused on the injection of water into disposal wells, landfills, etc. The field under study is a producer of heavy crude oil (API of 8° in Formation 1 and 20° in Formation 2 (sand packages A and B), has high water cut, high viscosity and has a high amount of remaining oil that remains. in the undrained reservoir despite the use of artificial lift systems in the producing wells, with the recovery factor (RF) being one of the most critical aspects, being only 8% in Formation 1 and 16% in Formation 2; for these reasons, it is considered that improved recovery (EOR) processes could be not only a solution to increase the recovery factor of the field, but also transform them into increasingly environmentally friendly processes, which is one of the objectives and/or commitments for the year 2030-2050 of the operating company.
URI: https://hdl.handle.net/20.500.11839/9506
Citación: APA 7th - Restrepo Rodríguez, L. S. y Molano Puerto, D. M. (2024) Diseño del completamiento para un pozo inyector de CO2 alternado con agua ubicado en la Cuenca de los Llanos Orientales de Colombia. [Tesis de maestría, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9506
línea de énfasis: Completamiento de pozos para recobro mejorado
Aparece en las colecciones:Tesis - Maestría en Recuperación Avanzada de Hidrocarburos

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
40289-2024-I-MRAH.pdf
Accesso Restringido
2.58 MBAdobe PDFVisualizar/Abrir    Request a copy
AUTORIZACIÓN PARA PUBLICACIÓN ACCESO CERRADO.pdf
Accesso Restringido
92.13 kBAdobe PDFVisualizar/Abrir    Request a copy


Este ítem está sujeto a una licencia Creative Commons Creative Commons