Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/8153
Title: Elaboración de un plan de mantenimiento para una grúa tipo celosía bucyrus 38-B de la empres Subsuelos S.A.S. en Cota-Cundinamarca
Other Titles: Development of a maintenance plan for a lattice crane of the Subsuelos SAS in Cota-Cundinamarca
Authors: López Gamboa, Nicolás Alfonso
License type: Atribución – No comercial
Keywords: Estructura celosía;Grúa celosía;Mantenimiento predictivo;Lattice structure;Lattice crane;Predictive Maintenance;Tesis y disertaciones académicas
Issue Date: 26-Aug-2020
Publisher: Fundación Universidad de América
Resumen: Para lograr el desarrollo total del proyecto presentado a continuación, titulado “Plan de mantenimiento para una grúa tipo celosía bucyrus 38-B de la empresa Subsuelos S.A.S en Cota-Cundinamarca” se empezó por caracterizar los sistemas de la grúa para tener conocimiento de los elementos y componentes presentes, posterior a esto, mediante visitas de campo al taller de mantenimiento se procedió a dar un diagnóstico de los sistemas, conociendo así el estado actual de la máquina, una vez determinado esto se realizó un análisis de criticidad para determinar que sistemas son más críticos que otros y en qué orden se debe implementar el plan de mantenimiento, se realizó una evaluación entre las estrategias de mantenimiento TPM, RCM y AMEF para establecer cuál de estas se acoplaba mejor a las tareas operacionales y condición de la grúa. Luego de haber realizado la evaluación de estrategias se concluyó que la más adecuada para esta máquina es el análisis de modo y efecto de falla, entonces se procedió a implementar esta estrategia para realizar el plan de mantenimiento, se establecieron diferentes modos de falla para realizar el respectivo AMEF a los sistemas, del mismo modo se asignaron tareas de lubricación e inspección al programa de mantenimiento en donde se tienen en cuenta factores como el tiempo, el lugar de reparación, la persona encarga y diferentes aspectos que permiten realizar mejor este plan de tareas programadas.
Abstract: In order to achieve the full development of the project presented below, entitled "Development of a maintenance plan for a lattice crane of the Subsuelos SAS in Cota-Cundinamarca" began by characterizing the crane systems to gain knowledge of the elements and components present, after this, through field visits to the maintenance workshop, a diagnosis of the systems was given, thus knowing the current state of the machine, once this was determined, a criticality analysis was carried out to determine which systems are more critical than others and in what order the maintenance plan should be implemented, an evaluation was carried out between the maintenance strategies TPM, RCM and FMEA to establish which of these best suited the operational tasks and condition of the crane. After having carried out the evaluation of strategies, it was concluded that the most appropriate for this machine is the failure mode and effect analysis, then this strategy was implemented to carry out the maintenance plan, different failure modes were established to perform the respective FMEA to the systems, in the same way lubrication and inspection tasks were assigned to the maintenance program where factors such as time, the place of repair, the person in charge and different aspects that allow to better carry out this task plan are taken into account scheduled.
URI: https://hdl.handle.net/20.500.11839/8153
Citation: APA 7th - López Gamboa, N. A. (2020) Elaboración de un plan de mantenimiento para una grúa tipo celosía bucyrus 38-B de la empres Subsuelos S.A.S. en Cota-Cundinamarca. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8153
Appears in Collections:Trabajos de grado - Ingeniería Mecánica

Files in This Item:
File Description SizeFormat 
4132718-2020-III-IM.pdf3.12 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
226.52 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons