Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/7814
Title: | Evaluación Técnico Financiera de la mejor opción de cañoneo en los campos de la Gerencia de Operaciones y Desarrollo Apiay (GDA) de Ecopetrol S.A. |
Other Titles: | Financial and technical evaluation of the best perforating option in the fields of operations and Development management Apiay (GDA) of Ecopetrol S.A. |
Authors: | Lopez Palacios, Juan Camilo |
Thesis advisor: | Ruiz Alzate, Leonardo |
License type: | Atribución – No comercial – Compartir igual |
Keywords: | Cañoneo;Daño de Formación;Perforating;Formation damage;Tesis y disertaciones académicas |
Issue Date: | 14-Feb-2020 |
Publisher: | Fundación Universidad de América |
Resumen: | Una de las problemáticas actuales más difíciles de enfrentar por parte de la Industria Petrolera es la baja productividad de los pozos, la misma que depende de diversos factores, siendo uno de los más importantes el proceso de cañoneo. Las operaciones de cañoneo son fundamentales y decisivas en la producción del pozo desde la etapa de completamiento hasta la implementación de trabajos de workover. Por esta razón, la selección adecuada de estas operaciones debe minimizar futuras reparaciones y maximizar la vida útil del pozo. Esta selección no solo afecta la producción sino también el mantenimiento del pozo, lo que se ve reflejado en los costos y tiempos operativos. De esta forma, el objetivo de este trabajo consiste en la evaluación de las operaciones de cañoneo realizadas en los campos de la Vicepresidencia Regional Orinoquia (VRO), ubicada en la Cuenca de los Llanos Orientales una de las más productivas del país; lo que permitirá determinar la mejor operación técnica como económicamente aplicada. Para este propósito se realizó el análisis a partir del criterio de Índice de Productividad por pie disparado y mD de permeabilidad (IP/k*h), acompañado de los principales datos de petrofísica y parámetros para la correcta práctica del proceso, que permitieron determinar el desempeño de las operaciones de cañoneo realizadas en la regional. El análisis se llevó a cabo en el programa Excel en el cual se desarrolló una matriz mediante una base de datos, tablas dinámicas y gráficas para la evaluación de las operaciones. |
Abstract: | One of the most difficult problems to face today by the Oil Industry is the low productivity of the wells, which depends on several factors, one of the most important being the cannoning process. Gunship operations are fundamental and decisive in the production of the well from the stage of completion to the implementation of workover jobs. For this reason, the right selection of these operations should minimize future repairs and maximize the life of the well. This selection not only affects the production but also the maintenance of the well, which is reflected in the costs and operating times. In this way, the objective of this work is the evaluation of the cannon operations carried out in the fields of the Regional Vice-presidency Orinoquia (VRO), located in the Eastern Plains Basin, one of the most productive in the country; which will allow to determine the best technical operation as economically applied. For this purpose, the analysis was carried out based on the criterion of Productivity Index per foot shot and mD of permeability (IP / k * h), accompanied by the main petrophysics data and parameters for the correct practice of the process, which allowed determining the performance of the cannon operations carried out in the regional. The analysis was carried out in the Excel program in which a matrix was developed using a database, dynamic tables and graphs for the evaluation of operations. |
URI: | https://hdl.handle.net/20.500.11839/7814 |
Citation: | APA 6th - Ruiz Alzate, L. y Lopez Palacios, J, C. (2020) Evaluación Técnico Financiera de la mejor opción de cañoneo en los campos de la Gerencia de Operaciones y Desarrollo Apiay (GDA) de Ecopetrol S.A. (Trabajo de grado). Fundación Universidad de América. Retrieved from https://hdl.handle.net/20.500.11839/7814 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5132809-2020-1-IP.pdf | 1.78 MB | Adobe PDF | View/Open | |
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN DE PUBLICACIÓN.pdf Access Restricted | 1.21 MB | Adobe PDF | View/Open Request a copy |