Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/9173
Title: | Evaluación del rendimiento operacional en la bajada de tubería para un taladro de workover. |
Authors: | Díaz Sánchez, Mateo Venegas González, Julián |
License type: | Atribución – No comercial – Sin Derivar |
Keywords: | Evaluación de rendimiento;Rendimiento operacional;Taladro de workover;Performance evaluation;Operational performance;Workover drill;Tesis y disertaciones académicas |
Issue Date: | 6-Feb-2023 |
Publisher: | Fundación Universidad de América |
Resumen: | Las operaciones de bajada de tubería al pozo, son de los procedimientos de mayor importancia para los equipos Workover, debido a que sus tiempos de ejecución dentro del programa del pozo representan un gran porcentaje; en adición, estas operaciones exigen al máximo los componentes del equipo, siendo una de las principales causantes de desgastes, daños a los equipos y riesgos al personal, además de tener consecuencias directas con el costo de las operaciones. |
Abstract: | The operations of lowering the pipe to the well are one of the most important procedures for the Workover equipment, because their execution times within the well program represent a large percentage; In addition, these operations make the most of the equipment components, being one of the main causes of wear, damage to equipment and risks to personnel, in addition to having direct consequences with the cost of operations. |
URI: | https://hdl.handle.net/20.500.11839/9173 |
Citation: | APA 7th - Díaz Sánchez, M. y Venegas González, J. (2023) Evaluación del rendimiento operacional en la bajada de tubería para un taladro de workover. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9173 |
metadata.dc.publisher.program: | Evaluación del rendimiento |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5171577-2023-1-IP.pdf | 866.01 kB | Adobe PDF | View/Open | |
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf Access Restricted | 648.47 kB | Adobe PDF | View/Open Request a copy |