Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/8261
Title: Evaluación de la implementación del equipo de Coiled Tubing para operaciones de abandono técnico en pozos con presencia de presión contenida en el Campo Casabe
Other Titles: Evaluation of the implementation of the Coiled Tubing equipment for technical abandonment operations in wells with presence of pressure contained in Casabe Field
Authors: Cárdenas Sáenz, Yuber Hernando
Gutiérrez Mora, José Alfonso
Thesis advisor: Carvajal Castillo, Camilo
Ortiz Martínez, Javier Mauricio
López Miranda, Marlhin Amada
License type: Atribución – No comercial
Keywords: Abandono técnico;Balanceo de tapón;Tapón de cemento;Technical abandonment;Plug balancing;Cement plug;Tesis y disertaciones académicas
Issue Date: 17-Feb-2021
Publisher: Fundación Universidad de América
Resumen: Este documento expone, como objetivo principal, la implementación el equipo de Coiled Tubing para la realización de abandonos técnicos en pozos con presencia de presión contenida, debido a que este equipo posee una amplia variedad de usos tales como perforación, completamiento, reacondicionamiento del hueco, de abandono del pozo, entre otros. A su vez, posee un sistema preventor llamado Stripper, el cual genera un sello dinámico que permite a la tubería ingresar al pozo y realizar trabajos en pozos fluyentes, controlando y conteniendo la presión, gracias que soporta hasta 10.000 psi, aumentando la seguridad y reduciendo los posibles incidentes durante las operaciones.
Abstract: This document sets out, as its main objective, the implementation of the Coiled Tubing equipment to carry out technical abandonments in wells with the presence of contained pressure, because this equipment has a wide variety of uses such as drilling, completion, hole reconditioning, of abandonment of the well, among others. In turn, it has a preventive system called Stripper, which generates a dynamic seal that allows the pipe to enter the well and perform work in flowing wells, controlling and containing the pressure, thanks to the fact that it supports up to 10,000 psi, increasing safety and reducing possible incidents during operations.
URI: https://hdl.handle.net/20.500.11839/8261
Citation: APA 7th - Cárdenas Sáenz, Y. H. y Gutiérrez Mora, J. A. (2021) Evaluación de la implementación del equipo de Coiled Tubing para operaciones de abandono técnico en pozos con presencia de presión contenida en el Campo Casabe. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8261
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5161500-5161453-2021-1-IP.pdf4.94 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
163.17 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons