Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/8261
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Carvajal Castillo, Camilo | - |
dc.contributor.advisor | Ortiz Martínez, Javier Mauricio | - |
dc.contributor.advisor | López Miranda, Marlhin Amada | - |
dc.contributor.author | Cárdenas Sáenz, Yuber Hernando | - |
dc.contributor.author | Gutiérrez Mora, José Alfonso | - |
dc.date.accessioned | 2021-04-03T22:53:22Z | - |
dc.date.available | 2021-04-03T22:53:22Z | - |
dc.date.issued | 2021-02-17 | - |
dc.identifier.citation | APA 7th - Cárdenas Sáenz, Y. H. y Gutiérrez Mora, J. A. (2021) Evaluación de la implementación del equipo de Coiled Tubing para operaciones de abandono técnico en pozos con presencia de presión contenida en el Campo Casabe. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8261 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.11839/8261 | - |
dc.description | This document sets out, as its main objective, the implementation of the Coiled Tubing equipment to carry out technical abandonments in wells with the presence of contained pressure, because this equipment has a wide variety of uses such as drilling, completion, hole reconditioning, of abandonment of the well, among others. In turn, it has a preventive system called Stripper, which generates a dynamic seal that allows the pipe to enter the well and perform work in flowing wells, controlling and containing the pressure, thanks to the fact that it supports up to 10,000 psi, increasing safety and reducing possible incidents during operations. | spa |
dc.description.abstract | Este documento expone, como objetivo principal, la implementación el equipo de Coiled Tubing para la realización de abandonos técnicos en pozos con presencia de presión contenida, debido a que este equipo posee una amplia variedad de usos tales como perforación, completamiento, reacondicionamiento del hueco, de abandono del pozo, entre otros. A su vez, posee un sistema preventor llamado Stripper, el cual genera un sello dinámico que permite a la tubería ingresar al pozo y realizar trabajos en pozos fluyentes, controlando y conteniendo la presión, gracias que soporta hasta 10.000 psi, aumentando la seguridad y reduciendo los posibles incidentes durante las operaciones. | spa |
dc.language.iso | es | spa |
dc.publisher | Fundación Universidad de América | spa |
dc.rights | Atribución – No comercial | spa |
dc.subject | Abandono técnico | spa |
dc.subject | Balanceo de tapón | spa |
dc.subject | Tapón de cemento | spa |
dc.subject | Technical abandonment | spa |
dc.subject | Plug balancing | spa |
dc.subject | Cement plug | spa |
dc.subject | Tesis y disertaciones académicas | spa |
dc.title | Evaluación de la implementación del equipo de Coiled Tubing para operaciones de abandono técnico en pozos con presencia de presión contenida en el Campo Casabe | spa |
dc.title.alternative | Evaluation of the implementation of the Coiled Tubing equipment for technical abandonment operations in wells with presence of pressure contained in Casabe Field | spa |
dc.type | bachelorThesis | spa |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5161500-5161453-2021-1-IP.pdf | 4.94 MB | Adobe PDF | View/Open | |
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf Access Restricted | 163.17 kB | Adobe PDF | View/Open Request a copy |