Analizar técnica y financieramente la tecnología rigless para intervención a pozo con equipo electro sumergible instalado

Thumbnail Image

Date

2019-02-12

Journal Title

Journal ISSN

Volume Title

Research teaching director

Non-research teaching director

External teaching director

Publisher

Fundación Universidad de América

Abstract

El presente trabajo lleva como propósito realizar el análisis de tres tecnologías rigless implementadas en pozos con bombeo electro sumergible instalado como método de levantamiento artificial, para el mantenimiento o reemplazo de la bomba por los diferentes problemas que en este levantamiento se presentan, como el arenamiento desgaste o insuficiencias en sus partes. Para efectuar el desarrollo se exponen el bombeo electro sumergible y sus partes conjunto con el método actualmente implementado para este tipo de trabajo que es el workover. Dando paso a la explicación de cada una de las tecnologías a evaluar ZEiTECS, Redacoil y AccessESP y las unidades de mantenimiento Coiled Tubing Slick Line Wire Line con las que se realizarán los trabajos aplicados en el pozo y mediante una matriz de selección teniendo en cuenta producción diferida tiempo de operación mano de obra disponibilidad y seguridad. Luego de seleccionar la tecnología que determine la matriz sea la mejor para el caso del pozo Y, pasamos a evaluar financieramente la aplicación de esta definido la inversión y beneficios económicos que trae la instalación vs los procesos tradicionales para así definir la viabilidad de esta mediante el VPN.

Description

The present work aims to perform the analysis of three rigless technologies implemented in wells with electro-submersible pumping installed as an artificial lift method, for the maintenance or replacement of the pump for the different problems that arise in this survey, such as sandblasting wear or insufficiencies in its parts. To carry out the development, the submersible electropumping and its parts are exposed together with the method currently implemented for this type of work, which is the workover. Giving way to the explanation of each one of the technologies to evaluate ZEiTECS, Redacoil and AccessESP and the Coiled Tubing Slick Line Wire Line maintenance units with which the works applied in the well and through a selection matrix taking into account production deferred labor time availability and security. After selecting the technology that determines the matrix is the best for the case of well Y, we will financially evaluate the application of this defined investment and economic benefits that the installation brings with the traditional processes to define the viability of this through the VPN.

Keywords

Bombeo electrosumergible, Unidad de mantenimiento, Rigless, Workover, Maintenance unit, Tesis y disertaciones académicas

Citation

APA 6th - García Caviedes, I. F. y Moreno Enciso, C. A. (2019) Analizar técnica y financieramente la tecnología rigless para intervención a pozo con equipo electro sumergible instalado (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/7352