Diseñar una planta de tratamiento de gas, mediante el software Aspen Hysis para el aprovechamiento del gas producido en Campo Tello

Thumbnail Image

Date

2020-11-03

Journal Title

Journal ISSN

Volume Title

Research teaching director

Non-research teaching director

External teaching director

Publisher

Fundación Universidad de América

Abstract

El campo Tello ubicado en la cuenca del Valle Superior y que es operado y desarrollado por Ecopetrol manejó el gas como un fluido asociado a la producción de los pozos de bajo interés que gracias a su composición lo hacen poco viable para la alimentación de motores de combustión, ya que por sí solo contiene un bajo Número de Metano y un alto contenido de hidrocarburos pesados. En este orden de ideas y desde entonces, el gas se ha venido quemando al aire, con el respectivo pago de regalías de acuerdo a las resoluciones dadas por la ANH. Por otro lado, el campo Tello cuenta con un Contrato de Generación Eléctrica que recibe el gas desde otras fuentes que cumplen con las condiciones de gas, sin embargo; este recurso se ha reducido y la demanda energética se suple comprando al Sistema (Eléctrico) Interconectado Nacional. Para ello diseñó una planta de tratamiento de gas con el fin de aprovechar este activo producido en Campo Tello para la generación de energía y así disminuir los costos de operación del campo y de la empresa en específico.

Description

The Tello field located in the Upper Valley basin and which is operated and developed by Ecopetrol handled the gas as a fluid associated with the production of low-interest wells that thanks to its composition make it unfeasible for the supply of combustion engines, since by itself it contains a low Methane Number and a high content of heavy hydrocarbons. In this order of ideas and since then, the gas has been burning in the air, with the respective payment of royalties according to the resolutions given by the ANH. On the other hand, the Tello field has an Electric Generation Contract that receives the gas from other sources that meet the gas conditions, however; This resource has been reduced and energy demand is met by buying from the National Interconnected (Electric) System. For this, he designed a gas treatment plant in order to take advantage of this asset produced in Tello Field for power generation and thus reduce the costs of operating the field and the company in specific.

Keywords

Aprovechamiento del gas, Planta de tratamiento de gas, Potencial calorífico, Use of gas, Gas treatment plant, Calorific potential, Tesis y disertaciones académicas

Citation

APA 7th - Vargas Manrique, M. F. y Yepes Guzmán, J. D. (2020) Diseñar una planta de tratamiento de gas, mediante el software Aspen Hysis para el aprovechamiento del gas producido en Campo Tello. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8208