Evaluación técnico financiera de la implementación del Sistema de Deployment de longitud extendida para trabajos de cañoneo con Coiled Tubing en pozos vivos del Bloque Piedemonte

Thumbnail Image

Date

2019-08-17

Journal Title

Journal ISSN

Volume Title

Research teaching director

Non-research teaching director

External teaching director

Publisher

Fundación Universidad de América

Abstract

En el presente trabajo de grado se evaluó técnica y financieramente la implementación de un Sistema de Deployment de longitud extendida para trabajos de cañoneo con tubería flexible teniendo condición de pozo vivo. Se inició con la parte teórica, donde se describieron las generalidades y geología del Bloque Piedemonte con el fin de ubicar al lector en el escenario de la implementación, seguido de una descripción de las generalidades de las operaciones de cañoneo convencionales en el Bloque Piedemonte, donde fueron identificadas las limitaciones de los métodos de transporte rigless (unidad de cable y tubería flexible). Además, se realizó una descripción de los fundamentos del Sistema de Deployment enfocados en operaciones de cañoneo. Para la etapa de planeación, fueron realizados los diseños y la descripción de las simulaciones de modelamiento de fuerzas mecánicas e hidráulicas para los escenarios con cable eléctrico convencional, tubería flexible convencional y tubería flexible con Sistema de Deployment en dos pozos con requerimiento de operaciones de cañoneo de longitud extendida. Para la etapa de ejecución, fue realizada la implementación de esta nueva tecnología en uno de los pozos seleccionados. Por último, para la parte de evaluación técnico-financiera, se elaboró una matriz de selección que permitió integrar aspectos operativos, de seguridad y financieros para evaluar la eficiencia y viabilidad del Sistema de Deployment junto con las alternativas convencionales de cañoneo, de esta manera, fue posible seleccionar la opción viable con mayor grado de eficiencia y seguridad. Dicha implementación validó al Sistema de Deployment como la alternativa más eficiente en ambos pozos al compararla con los métodos convencionales de cañoneo con varias corridas.

Description

In this degree project, was evaluated technically and financially the implementation of an extended-length Deployment System for perforating jobs with Coiled Tubing having live well condition. It began with the theoretical part, where the generalities and geology of the Piedemonte Block were described in order to place the reader in the implementation scenario, followed by a description of the generalities of conventional perforating jobs in the Piedemonte Block, where limitations of the rigless transport methods (Electric Line and Coiled Tubing Unit) were identified. In addition, a description of the fundamentals of Deployment System operations focused on perforating jobs was performed. For the planning stage, the designs and the description of the modeling simulations of mechanical and hydraulic forces were performed for the scenarios with conventional electric line, conventional coiled tubing and coiled tubing with Deployment System in two wells with requirement of extended length perforating job. For the execution stage, the implementation of this new technology was carried out in one of the selected wells. Finally, for the technical-financial evaluation part, a selection matrix was developed that allowed the integration of operational, security and financial aspects to evaluate the efficiency and viability of the Deployment System together with conventional perforating alternatives, in this way, It was possible to select the viable option with greater efficiency and safety. This implementation validated the Deployment System as the most efficient alternative in both wells compared to conventional perforating with several runs.

Keywords

Sistema de Deployment, Tubería flexible, Pozo vivo, Cañoneo, Deployment System, Coiled tubing, Live well, Perforating, Tesis y disertaciones académicas

Citation

APA 6th - Bernal Briceño, V. (2019) Evaluación técnico financiera de la implementación del Sistema de Deployment de longitud extendida para trabajos de cañoneo con Coiled Tubing en pozos vivos del Bloque Piedemonte (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/7655