Aseguramiento de la integridad del cable de perforación mediante el diseño de una herramienta digital para el cálculo de la variable tonelada-milla en operaciones de perforación y workover de la compañía Estrella International Energy Services.
Date
2020-08-21
Journal Title
Journal ISSN
Volume Title
Director
Research teaching director
Non-research teaching director
External teaching director
Publisher
Fundación Universidad de América
Abstract
Es fundamental para las compañías del sector petrolero disminuir los costos sin poner en riesgo las operaciones, la vida humana y los equipos. El cable de perforación es un elemento crítico en la perforación y mantenimiento de pozos, dada la eventualidad del rompimiento del cable por un ineficiente control se podrían generar desde grandes pérdidas económicas por daño a los equipos hasta pérdida de vidas humanas. En este proyecto se presenta un método efectivo para poder realizar un aseguramiento total al cable de perforación, alargando al máximo su vida útil reduciendo costos, sin poner en riesgo vidas humanas y la integridad de los equipos. Para esto, se realizó un estudio de las operaciones y especificaciones de los equipos que afectan la integridad del cable, tomando como referencia las normas IADC, API RP 9B, API SPEC 9A, API RP 54, ISO 4309 y recomendaciones del fabricante, donde se evidenció que para el correcto desempeño del cable, es fundamental el estado del sistema de levante de los equipos, razón por la cual se evaluó este a 4 equipos y a partir de inspecciones visuales, dimensionales y pruebas no destructivas para descartar un daño prematuro por condiciones mecánicas en donde se concluyó que todos los elementos del sistema de izaje se encuentran dentro de la normatividad y no agregan un desgaste mecánico al cable.
Description
It is essential for companies in the oil sector to reduce costs without putting operations, human lives, and equipment at risk. The drilling line is a critical element in the drilling and maintenance of wells, given the eventuality of the cable breaking due to inefficient control, it could generate from great economic losses due to damage to equipment to loss of human life. In this project, an effective method is presented to be able to carry out a total insurance to the drilling line, extending its useful life to the maximum reducing costs, without putting human lives and the integrity of the equipment at risk. For this, a study of the operations and specifications of the equipment that affect the integrity of the wire rope was carried out, taking as reference the IADC standards, API RP 9B, API SPEC 9A, API RP 54, ISO 4309 and manufacturer's recommendations, where It showed that for the correct performance of the wire rope, the condition of the equipment lifting system is essential, which is why it was evaluated on 4 equipment and from visual, dimensional inspections and non-destructive tests to rule out premature damage due to mechanical conditions where it was concluded that all the elements of the lifting system are within the regulations and do not add mechanical wear to the wire rope.
Keywords
Cable de perforación, Herramienta digital, Reacondicionamiento, Drill Cable, Digital Tool, Workover, Tesis y disertaciones académicas
Citation
APA 7th - Camacho Martínez, J. C. y Morales Bohórquez, C. D. (2020) Aseguramiento de la integridad del cable de perforación mediante el diseño de una herramienta digital para el cálculo de la variable tonelada-milla en operaciones de perforación y workover de la compañía Estrella International Energy Services. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8137
