Title: Evaluación de la implementación de un sistema de levantamiento dual con jet pump en caso de falla de bomba electrosumergible en pozos representativos del Campo C.
Other Titles: Evaluation of a dual lift system implementation with jet pump in case of electrosumersible pump failure in representative wells of field C
Authors: Garzón Alfonso, Juan Pablo
Orjuela Cuervo, Paola Andrea
Thesis advisor: Espinosa, Jorge Iván
License type: Atribución – No comercial
Keywords: Bomba electrosumergible;Sistema de levantamiento;Electrosumergible pump;Lifting system;Tesis y disertaciones académicas
Issue Date: 20-Aug-2020
Publisher: Fundación Universidad de América
Resumen: La principal desventaja del bombeo electro sumergible es que, a pesar de sus altos índices de producción, en caso de falla, las perdidas por costos de intervención, afectación al skill schedule y compra de una nueva bomba son muy altos, adicionales a las pérdidas en ganancias netas por las diferidas asociadas al tiempo de parada. En el Campo C cuando el sistema de levantamiento artificial ESP de los pozos falla, la compañía debe realizar un proceso de convocatoria con el fin de contratar un workover y por ende ampliar el presupuesto de inversión de trabajos en fondo, dejando como consecuencia el aumento de los tiempos de parada generando mayores diferidas. En este trabajo de grado se evalúa la implementación de un sistema de levantamiento dual con Jet pump en caso de falla de bomba electrosumergible en pozos representativos del campo C, mediante una simulación de producción en el software Syal, determinando la configuración más optima e ideal del bombeo Jet, asegurando un desempeño acorde al potencial de producción del pozo generando una reducción de diferidas en el periodo de falla de la bomba ESP.
Abstract: The biggest disadvantage of electric submersible pumping is that, despite its high production rates, in the event of failure, intervention costs losses, skill schedule affecting and purchasing a new pump are very high, in additional losses of net earnings by the associated downtimes not producting times deferrals. In Field C when the ESP artificial lifting system of the wells fails, the company must carry out an announcement in order to contract a workover and therefore expand the investment budget of bottom works, leaving as a consequence the increase of downtimes generating higher deferrals. In this degree project, the implementation of a dual lifting system with Jet pump is evaluated in the event of failure of an electric-submersible pump in representatives wells of Field C, through a production simulation in the Syal software, determining the most ideal and optimal configuration of the Jet pumping, ensuring performance in accordance with the production potential of the well, generating a deferrals reduction in the failure period of the ESP pump.
URI: https://hdl.handle.net/20.500.11839/8142
Citation: APA 7th - Garzón Alfonso, J. P. y Orjuela Cuervo, P. A. (2020) Evaluación de la implementación de un sistema de levantamiento dual con jet pump en caso de falla de bomba electrosumergible en pozos representativos del Campo C.. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8142
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5151204-2020-III-IP.pdf3.01 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
284.81 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons