Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/7830
Title: | Optimización del sistema de bombeo mecánico para máxima eficiencia de levantamiento en tres pozos que presenten interferencia por gas en el campo Palagua |
Other Titles: | Optimization of the mechanical pumping system for maximum lifting efficiency in three wells that present gas interference in the Palagua field |
Authors: | Bohórquez Ibarbo, Camilo Ernesto |
License type: | Atribución – No comercial – Sin Derivar |
Keywords: | Interferencia por gas;Bomba subsuelo;Eficiencia de llenado;Mechanical pumping;Filling efficiency;Gas interference;Tesis y disertaciones académicas |
Issue Date: | 6-Feb-2020 |
Publisher: | Fundación Universidad de América |
Resumen: | Este trabajo utiliza datos reales de 3 pozos del campo Palagua, ubicado en Puerto Boyacá, operado por la Unión Temporal IJP. Los principales resultados fueron, para darle mejor manejo al gas y evitar interferencia por gas en los pozos, uno de los dos posibles casos de optimización fue aumentar la eficiencia de la bomba como compresor mediante la disminución de los espacios muertos y el otro planteamiento fue la instalación de un separador tipo copa en el fondo con el fin de evitar la entrada de gas a la bomba y como conclusiones principales la disminución del espacio muerto en pozos con poca presencia de gas se hace más rentable, caso contrario que en pozos con alta relación gas petróleo se hace mucho más práctico la colación de separadores de gas en fondo. |
Abstract: | This work uses real data from 3 wells of the Palagua field, located in Puerto Boyacá, operated by the IJP Temporary Union. The main results were, to give better gas handling and avoid gas interference in the wells, one of the two possible cases of optimization was to increase the efficiency of the pump as a compressor by decreasing dead spaces and the other approach was the installation of a cup-type separator at the bottom in order to prevent the entry of gas to the pump and as main conclusions the decrease of dead space in wells with little gas presence becomes more profitable, otherwise, in wells with high ratio Gas oil is much more practical collation of gas separators in the background. |
URI: | https://hdl.handle.net/20.500.11839/7830 |
Citation: | APA 6th - Bohórquez Ibarbo, C. E. (2020) Optimización del sistema de bombeo mecánico para máxima eficiencia de levantamiento en tres pozos que presenten interferencia por gas en el campo Palagua (Trabajo de grado). Fundación Universidad de América. Retrieved from https://hdl.handle.net/20.500.11839/7830 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5121364-2020-1-IP.pdf | 3.57 MB | Adobe PDF | View/Open | |
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN DE PUBLICACIÓN.pdf Access Restricted | 1.41 MB | Adobe PDF | View/Open Request a copy |