Title: Elaboración de un plan de mejora del protocolo de mantenimiento de los equipos de perforación para la compañía Equion Energía Limited
Other Titles: Development of a plan to improve the maintenance protocol of drilling equipment for the company Equion Energía Limited
Authors: Cáceres Bello, Sergio
Laverde Ruíz, Michell Steven
License type: Atribución – No comercial
Keywords: Perforación;Plan de mantenimiento;Criticidad;Drilling;Maintenance plan;Criticity;Tesis y disertaciones académicas
Issue Date: 15-Aug-2018
Publisher: Fundación Universidad de América
Resumen: Para la solución de la problemática propuesta en el trabajo de grado el primer paso fue conocer la situación actual de los equipos de perforación que la compañía Equion Energía LIMITED utiliza en su operación ubicada en la región de Casanare (Colombia). Teniendo en cuenta la información suministrada por Equion de los equipos con mayor frecuencia de falla, se realizó un listado de los equipos, su condición actual y se le aplicaron criterios de criticidad. Posteriormente se enfatizó en los equipos con mayor criticidad y se elaboró un contexto operacional de cada equipo. Luego de esto, se procedió analizar las veces que fallaba cada equipo las cuales fueron suministradas por la base de datos de Equion, posterior a esto se realizó el modo y efecto de fallas de los equipos respectivos (AMEF). Una vez se determinaron los modos y efectos de las fallas de los equipos estudiados se pudo establecer las actividades de mejora para el protocolo de mantenimiento que se lleva en el taladro de perforación tipo AC operado actualmente.
Abstract: For the solution of the problem proposed in the work of degree the first step was to know the current situation of the drilling equipment that the company Equion Energy LIMITED uses in its operation located in the region of Casanare (Colombia). Taking into account the information provided by Equion of the equipment with the highest failure frequency, a list of the equipment was made, its current condition and criteria of criticality were applied. Subsequently, the most critical teams were emphasized and an operational context of each team was elaborated. After this, it was proceeded to analyze the times that each equipment failed which were supplied by the Equion database, after this the mode and effect of faults of the respective equipment (AMEF) was made. Once the modes and effects of the failures of the studied equipment were determined, it was possible to establish the improvement activities for the maintenance protocol that is carried out in the drilling hole type AC currently operated.
URI: http://hdl.handle.net/20.500.11839/6908
Citation: APA 6th - Cáceres Bello, S. y Laverde Ruíz, M. S. (2018) Elaboración de un plan de mejora del protocolo de mantenimiento de los equipos de perforación para la compañía Equion Energía Limited (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6908
Appears in Collections:Trabajos de grado - Ingeniería Mecánica

Files in This Item:
File Description SizeFormat 
4122579-2018-2-IM.pdf2.12 MBAdobe PDFView/Open


This item is licensed under a Creative Commons Licence Creative Commons