Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/6668
Title: Evaluación técnico-financiera de la sarta de varilla hueca implementada para el sistema de levantamiento de bombeo de cavidades progresivas en el pozo-a del campo Yaguará
Authors: Castillo Vargas, Ivan Camilo
Thesis advisor: Valderrama Cerón, Jasmine
Espinosa Mora, Carlos Alberto
License type: Atribución – No comercial
Keywords: Levantamiento artificial;Varilla Hueca;Bombeo de cavidades progresivas;Artificial lift;Hollow Rod;Progressive cavity pump;Tesis y disertaciones académicas
Issue Date: 2-Mar-2018
Publisher: Fundación Universidad de América
Resumen: El presente trabajo evalúa la implementación de una sarta con varilla hueca para el sistema de bombeo de cavidades progresivas (PCP) en un pozo con elevada tortuosidad, dog legs mayores a 4º/100 ft, y alta desviación, ángulos mayores a 50º, en el Campo Yaguará, donde las varillas convencionales y continuas fallaron en un tiempo menor a 75 días de operación. En primer lugar, se describen las generalidades y geología del Campo Yaguará, donde se encuentra el pozo objeto de estudio, con el fin de ubicar al lector en el escenario de la implementación; seguido de una descripción del sistema de levantamiento de bombeo de cavidades progresivas que entregó las herramientas necesarias para el desarrollo del análisis de fallas y de la respectiva simulación. Además, debido a las fallas recurrentes en el Pozo A, fue de vital importancia analizar cada una de las condiciones que llevaron a las distintas sartas de varillas implementadas a fallar en un corto periodo de tiempo, complementando con evidencias reales encontradas en las operaciones de servicio a pozo; para al final presentar la respectiva clasificación de las fallas mediante la metodología RIFT, aceptada en la industria Oil & Gas.
Abstract: This Job evaluates the implementation of the hollow rod in progressive cavity pumping system (PCP), in a well with high tortuosity, dog leg severity up to 4º/100 ft, deviation angles of 50º in Yaguara Field, where sucker and continuous rods failed in a brief period of time. First of all, the geology of Yaguara Field is described, where well A is located, with the purpose of established the reader in the implementation scenery. Secondly, the PCP system is explained with high detail to proceed with the respective failure analysis and the numerical simulation. Besides, due to the high frequency of the failures in well A, it was mandatory analyze each condition that led to the rod string to fail, complementing with real evidences found in the pulling operations; summarizing with the respective failures classification following the RIFT methodology, accepted in oil and gas industry. Additionally, numerical simulations was carried out to each of the differents rods evaluated (Sucker, Continuous and Hollow) with the software PC-Pump, property of C-Fer technologies.
URI: http://hdl.handle.net/20.500.11839/6668
Citation: APA 6th - Castillo Vargas, I. C. (2018) Evaluación técnico-financiera de la sarta de varilla hueca implementada para el sistema de levantamiento de bombeo de cavidades progresivas en el pozo-a del campo Yaguará (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6668
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5131647-2018-1-IP.pdf5.56 MBAdobe PDFView/Open


This item is licensed under a Creative Commons Licence Creative Commons